TYSRO OBSERVATORY
0.82″ (Clear)
ACTIVE
TYSRO Official Logo
TYSROSpace Research
AboutPlanetariumResearchProjectsDownloadCoursesTeamAchievementsPublicationsEvents
Apply to Join TYSRO
Back to Projects Archive
Observational Instrumentation & Hardware
ENGINEERING PROJECT IN DEVELOPMENT

SaturnX 20D Telescope

A large-aperture Dobsonian instrument designed for lunar, planetary, and deep-sky observation and astronomical imaging with the explicit goal of sharing observations publicly.

PROJECT DIRECTORS & LEADSKamlesh, Aneshwar Venkatesan Tesla
CURRENT STATUSACTIVE
LAB INITIATIVETYSRO Hardware Lab

Engineering & Observational Objectives

Construct a rigid, portable 200mm (8-inch) Dobsonian alt-azimuth optical system.
Capture high-resolution digital imaging of lunar rilles, Jupiter's cloud belts, and Saturn's ring structure.
Conduct community star parties and public observational sessions across Tamil Nadu.
Distribute calibrated astronomical observational data freely to student researchers.

Technical & Optical Specifications

ParameterSpecification ValueDesign Notes
Optical DesignNewtonian Reflector on Dobsonian MountEngineering Standard
Aperture200 mm (7.87 in)Engineering Standard
Focal Length1200 mmEngineering Standard
Focal Ratiof/6.0Engineering Standard
Resolving Power0.58 arcseconds (Dawes Limit)Engineering Standard
Limiting Magnitude14.0 visual magnitudeEngineering Standard
Primary Mirror SubstrateBorosilicate Precision GlassEngineering Standard
Optical CoatingEnhanced Aluminum (96% reflectivity) with SiO2 overcoatEngineering Standard
Mount TypeAlt-Azimuth Rocker Box with Teflon/Formica friction bearingsEngineering Standard
Focuser2-inch Dual-Speed 1:10 Crayford Focuser with 1.25-inch adapterEngineering Standard
Finder Scope9x50 Right-Angle Correct-Image Finder & Telrad Reflex SightEngineering Standard
Imaging TrainHigh-framerate planetary CMOS sensor + 2.5x Apochromatic BarlowEngineering Standard

Fabrication & Assembly Timeline

COMPLETEDPhase 1: Optical Design & Raytracing
2023-04
COMPLETEDPhase 2: Primary Cell & Mirror Mounting
2023-08
COMPLETEDPhase 3: Dobsonian Rocker Box Fabrication
2023-12
ACTIVEPhase 4: Collimation & First Light Calibration
2024-03
PLANNEDPhase 5: Public Star Party & Imaging Deployment
2024-Q3

Engineering Logs & Observational Tests

First Light Planetary Collimation Test

Kamlesh•20/3/2024

Conducted first light collimation under clear atmospheric seeing. Successfully resolved Cassini Division in Saturn's rings and Jupiter's Galilean satellites.

Alt-Azimuth Bearing Teflon Friction Optimization

Aneshwar Venkatesan Tesla•15/1/2024

Replaced standard nylon pads with virgin PTFE Teflon over textured laminate for smooth manual tracking at 300x magnification.